Shawnee, OK ODOT Bridge Scour Abutment

Shawnee, OK ODOT Bridge Scour Abutment

  • November 2015: Shawnee, OK
  • Fill Behind ODOT Bridge Scour Abutment

CellFill℠ debuted the new CC150 in November 2015 on a bridge abutment fill job for ODOT (Oklahoma Department of Transportation). This small job required the CC150 to pump slowly (approx. 10 cu/yds per hour) to allow the concrete to self-level and fill the smallest voids. Water plug was used to seal cracks in the abutment slope wall to prevent the cellular concrete from seeping through.

ODOT was very impressed with the versatility of the product and looks forward to using CellFill on future projects.