Brandenburg – Tyrone Power Plant

  • Lawrenceburg, KY

CellFill was subcontracted by Brandenburg for the abandonment of the Tyrone Power Station – a coal-fired power plant. Cellular concrete was used in lieu of traditional CLSM to fill in the basement of the structure which had an overall depth of 34 feet. This was completed over the course of twelve working days and a total of 16,106 cubic yards were placed.

The CellFill team was able to accomplish this in a short period of time due to utilizing larger lift heights, in excess of 11-feet. The stability of the cellular concrete produced through CellFill’s proprietary equipment allowed for the larger lift heights which resulted in accelerated construction time. The foam generation and the highly efficient mixing process of the neat slurry create a stable product which has been proven time and time again.

Leave a Comment