Irving, TX – NTC Abandoned Waterline Fill

Irving, TX – NTC Abandoned Waterline Fill February 2017: Irving, TX CellFill℠ As Fill For Abandoned Waterline Our largest project to date! CellFill℠ pumped 5921.24 CY of cellular concrete into over 12,000 linear ft of 48” diameter abandoned waterline in Irving, TX. This job paralleled Irving’s busy Hwy 183 and warranted constant site supervision and … Read more

Lowell, AR Storm Sewer Pipe Fill

Lowell, AR Storm Sewer Pipe Fill December 2016: Lowell, AR CellFill℠ As Fill For Abandoned Storm Sewer Pipe 5092 CY of cellular concrete was used to fill this 48” abandoned storm sewer pipe for the City of Lowell, AR. We cranked it up to produce at rates averaging 135 CY per hour. It was fun … Read more

Colcord, OK Drainage Layer Under Roadway

Colcord, OK Drainage Layer Under Roadway March 2016: Colcord, OK CellFill℠ As Drainage Layer Under County Road CellFill℠ traveled to Colcord, OK, to place 20 cu yds of cellular concrete as a drainage layer under 350’ of Delaware County concrete roadway. Big floods washed out the rock at varying depths underneath the road, so CellFill℠ … Read more

Adair, OK Abandoned Diesel Line Fill

Adair, OK Abandoned Diesel Line Fill February 2016: Adair, OK Abandoned Diesel Line Fill for Explorer Pipeline Company Explorer Pipeline Company hired CellFill℠ to pump cellular concrete into 3200’ of 2’ diameter (372 cu yds total) of abandoned diesel pipeline. The location of this job (in the middle of a pasture), and the distance from … Read more

Shawnee, OK ODOT Bridge Scour Abutment

Shawnee, OK ODOT Bridge Scour Abutment November 2015: Shawnee, OK Fill Behind ODOT Bridge Scour Abutment CellFill℠ debuted the new CC150 in November 2015 on a bridge abutment fill job for ODOT (Oklahoma Department of Transportation). This small job required the CC150 to pump slowly (approx. 10 cu/yds per hour) to allow the concrete to … Read more